Construction Management
After completion of the programme, you will be rewarded with no less than two diplomas: one from Lillebaelt Academy University of Applied Sciences (EAL), Denmark and one from National Institute of Management, Science and Technology (CNAM) in France.
As shown in the illustration below, you will study the first two semesters at your home institution, the 3rd and the 4th semesters at EAL in Denmark, and the 5th and 6th semesters at CNAM in France. The remaining semesters will take place at your home institution.
If you are enrolled at CNAM in France, please follow the turquoise arrows to find the structure of the double degree for you. If you are enrolled at EAL in Denmark, please follow the blue arrows to find

Description of Courses
Click here to download the full programme
The first year in your home institution
You will spend the first year of the programme in your home country.
The second year with Lillebaelt Academy (EAL) in Denmark
During the second year spent with EAL in Denmark, teaching is conducted through a “project-based learning” approach. There is no internship but projects are designed following the needs of companies.
Trainees will be students from the university in Denmark and funded by Erasmus grant and private funds.
3rd semester
The semester focuses on Industrial Building and Prefabricated Components. During this semester, you will work on an interdisciplinary assignment that focuses on digital design and prefabrication of a commercial building. The objectives of the semester are to introduce general prefabrication and modular systems building techniques, and 3D digital process of designing, manufacturing, delivering and installation of prefabricated structures. There will be focus on the following topics during the semester:
-
Building Design
-
Planning and Management
-
Technical Installations/Building Physics
-
Structural Design
-
Communication
4th semester
The semester focuses on Multi Storey Building. During this semester you will work on a project focusing on residential and commercial building. Together with other students, you will scrutinize an outline proposal, carry out the scheme design and perform the building application.
The semester focuses on the same topics as in the 3rd semester.
The third year with Le Conservatoire National des Arts et Métiers (CNAM) in France
During the third year in Strasbourg (France), you will have the status of employee with professional contract and follows an alternating rhythm on 1 month/1 month.
The bachelor is the “Licence Sciences, technologies, santé mention genie civil parcours Construction durable”.
5th and 6th semester
You will spend these two semesters with CNAM.
During these two semesters, your time will be divided between studies and internship. This means that some weeks you will spend at the university and some weeks you will spend as an intern in a company. The studies will focus on Renovation and Sustainability and on a project led by a multidisciplinary team of professors. You will study the following intensives courses:
-
BIM management
-
Thermal Building
-
Acoustic Building
-
Fluids Building
-
Envelope Building
-
Electricity Building
-
Energetic systems for building

